Silicone Convenient Egg White Yolk Separator Divider Filter Sifting Gadget

  • 500 - 1999 Pieces
    $0.41
  • 2000 - 9999 Pieces
    $0.39
  • >=10000 Pieces
    $0.37
Color:
Red Green
Lead Time:
Quantity(Pieces) 1 - 3000 3001 - 5000 5001 - 10000 >10000
Est. Time(days) 35 45 55 Negotiable
Customization:
Customized logo (Min. Order: 2000 Pieces)
Customized packaging (Min. Order: 2000 Pieces)

More

Graphic customization (Min. Order: 2000 Pieces)
customer design (Min. Order: 2000 Pieces) Less
Report Suspicious Activity
Overview
Quick Details
Type:
Egg Tools
Eggbeater Laying Method:
Tabletop / Portable
Function:
Milk Shake
Egg Tools Type:
Egg Dividers
Material:
Silicone
Certification:
FDA, LFGB, SGS
Feature:
Eco-Friendly, Safety ,soft ,convience
Place of Origin:
Guangdong, China
Brand Name:
OEM
Model Number:
2604356 egg seperator
Color:
Pantone Color
Size:
10.3*2.8CM
Shape:
Round
Logo:
Customized Logo
Usage:
Home kitchen
Sample Time:
3-5 Days
Product name:
egg seperator and egg divider
PAYMENT TERM:
30% Deposit
Design:
Eco-friendy
Supply Ability
Supply Ability:
300000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
pvc box or polybag with head card or hangtag or customerized
Port
yantian shenzhen
Lead Time :
Quantity(Pieces) 1 - 3000 3001 - 5000 5001 - 10000 >10000
Est. Time(days) 35 45 55 To be negotiated

  Slicone Convenient Egg White Yolk Separator Divider Filter Sifting Gadget

 

 

 Silicone material we use is food contact grade. Our products can pass test like FDA, LFGB, DGCCRF, DM 21/03/1973, JFSL,etc.Lab we tested include TUV, SGS, BV, INTERTEK.

 

Our products with heat resistance from -40 to 240 centi grade.

 

Color: Colorful personalized
Logo: Embossed,debossed,print
Packing: Tied card each piece, and carton, or according to client's requirement
Sample: Sample making time: 3-5days
Delivery time: Within 30-40 days after you are confirmed the order
Production  Process:

 1.Mould Making --

 2.Samples Making --

 3.Samples Confirming --

 4.Mass Production(will Initial Production Check) --

 5.Trimming --

 6. Final Quality Inspection --

 7.Packing --

 8.Shipment

Shipping term: Air shipping, Sea transportation,profession line,will choose best and cheaper one
Payment  terms:

 T/T,L/C etc.

 

 

 

 

  

                     
Silicone egg ringSilicone egg ring

 

Q:What is FDA, LFGB, DGCCRF, DM21/03/1973,JFSL?A: FDA if food contact products obligatory standard for USA, normally clients from Asia, America, Africa, Russia accept this standard.LFGB is food contact products obligatory standard for Germany. Normally our European clients accept this standard.DGCCRF is food contact products obligatory standard for France. France clients request this standard. DM 21/03/1973 is food contact products obligatory standard for Italy. Italy clients request this standard. JFSL is food contact products obligatory standard for Japan. Japanese clients normally request this standard. Q:What our products standard is ?A:We specify our products 2 standards only: FDA & LFGB. FDA category can pass test of FDA & JFSL. LFGB category can pass test of LFGB, DGCCRF & DM 21/03/1973. Q:If we conduct test regularly?A:Yes. Many of our clients request test before delivery. We will make internal test in advance before sending the test samples to the lab. In recent 3 years our test pass rate in lab is above 99%. When with few fails, after correcting the test conditions, re-test is always pass. Q:  CAN WE HAVE A SAMPLE? IF IT WILL BE CHARGED, AND HOW LONG IT TAKES TO RECEIVE?A: Yes, normally samples are with stock for free, shipping cost at your side. By express (UPS, DHL, Fedex, TNT, etc) it will take 3-5 days to arrive; Epacker takes longer sometimes like 2 to 3 weeks.Shipping cost USD20 to 50 (settled by Paypal), depends on size, weight, and service way. Or collect service by your account. In case samples to be newly made, USD$150 is chargeable due that the sampling cost is high. Q: WHAT’S YOUR DELIVERY TIME?A: Depends on quantity, artwork available time, pre-order test needed or not, pre-production sample approval time, etc. After pre-production sample confirmed, lead time can be 3 to 60 days, depends on quantity, or which product and which kind of package it is.30 to 45 days is common for mass production. Please always let us know your need. Q: WHAT’S THE TOOLING TIME SHALL WE HAVE AN OEM PROJECT?A: Depends on product size, structure, etc. It can be from 7 to 30 days. Q: WHAT’S YOUR PAYMENT TERM?A: For tooling is 100% in advance; for product orders, normally 30% deposit is required for new clients. When amount is small, 100% in advance is required to save transaction fee.You are always welcomed to contact us for more details. A kind reminder that, by Alibaba trade assurance (Alibaba on line order), you have guarantee on delivery time, quality and payment. Because Alibaba will pay your loss when you have a compliant. Currently this service supports orders more than USD100. 

<img src="//sc01.alicdn.com/kf/HTB1WG4TQpXXXXX8XFXX760XFXXX7/222166308/HTB1WG4TQpXXXXX8XFXX760XFXXX7.pn